Description: 
The U.S. District Court has an office area located at 800 Lafayette St., Suite 2100, Lafayette , La.. This area contains approximately 1,500 square feet and is due for cyclical maintenance upgrades in some of the areas. At this time the Court would like to remove wall covering in areas that the covering is releasing from the wall and replace with paint in this area. This area contains multiple rooms with carpet that will not be replaced and will need to be protected at all times. See Attachments for full details. Contact Glenn Richard at the email listed to schedule a walk though of the area.
Details: 

SPECIAL REQUIREMENTS/INFORMATION:
1. Coordination with courtroom use schedule will be required.
2. Existing carpet is to remain and shall be protected at all times.
3. Existing rooms with releasing wallcovering to be removed and painted. (See attached drawing schedule.)
a. Remove wall covering.
b. Skim walls with minimum two coats of joint compound for uniform smooth finish.
c. Sand walls as required for uniform smooth finish.
d. Minimum 1 coat of latex primer and minimum 2 coats of latex paint.
e. There shall be no bleed through of paint base color after final coats.
f. Color to be decided after award.
4. Tools are to be cleaned only in janitor’s closet mop sink or offsite location. No joint compound to be cleaned in mop sink.
5. Work areas are always to be kept clean.
6. All flooring, hardware, and baseboard moldings are to be protected from paint splatter.
7. All material and workmanship shall meet building standards.
8. All trash is the contractor’s responsibility to be removed from site. Building dumpsters shall not be used for disposal.